Sunday, December 22, 2019

Construct An Access Road For Materials Transport For A...

The focus of this project is to construct an access road to allow for materials transport to a site of future construction. With any project comes a need for trained individuals to manage it. The people placed into this position are referred to as project managers (PM). Regardless of how well trained or talented they are, there can be no real measurable success without the skillful use of the tools at their disposal. This paper will discuss a comprehensive plan to construction an access road that will eventually provide logistical flow to a future construction site; through establishing a Work Breakdown Structure (WBS), a baseline budget reflected through Earned Value Management (EVM), processes, planned in benchmarks and financial performance metrics to demonstrate productivity and scheduling according to an actionable plan. To begin with it is a requirement to understand the needs of this project in order to begin any planning. Things that should be taken into account are the available funding, allocated workforce, and time requirement of logistical flow to just mention a few. After this data is accumulated the WBS is created. According to Venkataraman (2008), The WBS is a foundational document to the project as a whole. It provides a phase oriented linear scheme to the project s schedule. This document will allow the Project Manager to track issues relating to cost, scheduling, and performance at the operational level. On the WBS cost estimations areShow MoreRelatedEconomic, Social And Environmental Change Essay1457 Words   |  6 Pagesimpacts and to ensure long term benefits led to the concept of sustainability. This has become accepted as an essential feature of development if the aim of increased well-being and greater equity in fulfilling basic needs is to be met for this and future genera tions. In order to predict environmental impacts of any development activity and to provide an opportunity to mitigate against negative impacts and enhance positive impacts, the environmental impact assessment (EIA) procedure was developed inRead MoreThe Impact Of The Commonwealth Games 20161068 Words   |  5 Pagesmoment, the money that the government spend on the construction are billion dollars but it can create more than 10000 jobs for the Australian and other potential benefit that the government will get in the future are very big. Because based on the game the Government have tight the relationship with 53 countries around the world and most of the country are from European. At the money that the government have spent on the rail and road transport are successful and satisficed for the Australian theyRead MoreMcgill University Health Center’S Ambition To Create A1560 Words   |  7 Pagescreate a Super Hospital, which will be known as the Glen site, is extremely admirable. This will be done through the unification of six different institutions; the Royal Victoria Hospital, the Montreal Children’s Hospital, the Montreal Chest Institute, the Cedars Cancer Centre and the Research Institute of the MUHC. We, SNC-Lavalin, would be honored to take it upon ourselves to construct such a complex and innovative project. As a construction company and as members of the community, we believe thatRead MoreRoad Congestion Impacts The Economic Production Of A City2887 Words   |  12 Pages Road congestion impacts the economic production of a city. The Kwinana Freeway Widening Project constructs additional two lanes southbound to keep up with the traffic flow during peak hour period. The Kwinana Freeway Widening Project shows that urban procurement strategies have been conducted to achieve consistency, safety, accuracy and efficiency during construction work. Additional items are considered during planning for this project such as utilities, traffic, property access, surveying, andRead MoreDubai, The Dark Side Of Dubai2676 Words   |  11 Pageswill discuss the sustainability factor of Dubai. Construction Dubai and its construction methods Being that there is a constant flow of construction in Dubai, the use of power tools and cranes is extremely high. There is not one road that you drive on, where there isn’t a building being constructed. The buildings that are being built are high-rise meaning the amount of cranes needed is at least 2-3 per building. The weight of materials used in constructing the buildings has an impact onRead MoreHistorical Sites Of Ancient Rome1752 Words   |  8 PagesPreservation Rome is famous for two of their greatest historical sites they are the Coliseum and the Pantheon. These historical sites will not last forever so Rome needs to find a way to preserve the sites. The problem Rome has right now is that there is a lot of air pollution and traffic near these sites which causes instability over time to these buildings. When these historical buildings were built the people of Rome didn’t know in the future that there would be a problem with traffic and pollution thatRead MoreAntamina Mining - Moving Mountains Case Study Analysis3375 Words   |  14 Pageslaid out a plan to transport concentrate from the mine to a port facility near the coastal city of Huarmey using existing roads, where possible, and constructing new sections of highway, where necessary. This plan included using a route that passed directly through the environmentally sensitive Huascaran National Park (â€Å"PNH†). Following a series of challenges with extensive social / pol itical and financial implications, CMA had to consider; should they change their original transport plans? If theyRead MoreEnvironmental Impact Assessment on Chikwawa Road in Malawi4612 Words   |  19 PagesAssessment (EIA) report for the proposed road to Fatima in Chikwawa district. The project runs from Thabwa (near Shire River) to Fatima. The road has a lot of bridges and culverts since it is near the Shire River. The project proponent is Chikwawa Town Assembly with Asian Grant Aid estimated at US$ 7Million. The total length of the road is about 22 Km and is a dusty road. There are 25 bridges and culverts that are estimated to be built along this road. ES 2 SCOPE OF THE WORKS The proposedRead MoreProject Management : The Brisbane Airport2887 Words   |  12 Pagescubic meters of sand onto the site. †¢ Over four years, the heaviness of the sand, working with 330,000 wick drains providing the water to the surface, will make a strong base for the runway. †¢ Once the base is prepared, development of the new runway and taxiways will start. †¢ Lighting, navigational guides and finishing will likewise occur in this phase. †¢ Environmentally stable and the venture will make 2,700 development employments. (BNE, 2015) REQUIREMENTS SITE PREPARATION: In order get onRead MoreProject Management Proposal Essay14353 Words   |  58 PagesExample 1 15 RFP Example 2 16 Subcontractor Evaluation(s) 17 Technical Proposal 18 Surveys amp; site justification 18 Infrastructure 21 Mobilization 23 Technical challenges: 27 How the challenges will be met: 27 Technical risk analysis: 28 Risk management plan: 28 Reclamation 29 Cost Proposal 30 Approach 30 Estimate 31 Labor Rates 31 Total Labor Costs 32 Material Costs 32 Equipment amp; Maintenance 33 Other/Buffer 33 Total Cost Estimate 34 Marketing Program

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.